Daytime Noise Monitoring Results -- Normal weekday          
Station M7a, Wah Ming House                  
Date Start Time End Time  Weather Noise level (dB(A)), 30 min Major Construction Noise Source(s) Observed Other Noise Source(s) Observed Remarks Temp. (°C) Wind Speed (m/s) Noise Meter Model / ID Calibrator Model / ID
Leq L10 L90
01-Nov-11 10:10 10:40 Sunny 69 71 67 No major construction works N.A N.A 24.6 <5 B&K 2238   S/N : 2684503 B&K 4231  S/N: 2385180
10-Nov-11 16:41 17:11 Cloudy 62 63 58 Excavation N.A N.A 19.4 <5 B&K 2238   S/N : 2684503 B&K 4231  S/N: 2385180
15-Nov-11 09:41 10:11 Sunny 63 63 60 No major construction works Operation of mobile breaker near Wah Cheung House N.A 23.5 <5 B&K 2238   S/N : 2381580 B&K 4231  S/N: 2385180
21-Nov-11 09:32 10:02 Sunny 68 69 66 Drilling Operation of mobile breaker near Wah Cheung House N.A 21.5 <5 B&K 2238   S/N : 2381580 B&K 4231  S/N: 2385180
      Min. 62                
      Max. 69